Friday, January 31, 2025

Developing an AI/ML Data Analysis Tool to replace a Quantity Surveyor structured roadmap to guide you through the development process.

 Developing an AI/ML Data Analysis Tool to replace a Quantity Surveyor (QS) 

A Quantity Surveyor (QS) needs several essential documents, data, and preparations before starting a Bill of Quantities (BOQ). Here’s a detailed list:

1. Project Information & Documents

  • Project Scope & Specifications – Detailed description of the project requirements, materials, and methods.
  • Architectural Drawings – Floor plans, elevations, sections, and details.
  • Structural Drawings – Foundation plans, beam layouts, column details, reinforcement details.
  • MEP Drawings (Mechanical, Electrical, Plumbing) – Layouts for HVAC, electrical wiring, plumbing, and fire protection.
  • Site Survey & Soil Investigation Report – Helps in foundation design and material selection.
  • BOQ Format & Standard Codes – FIDIC, SMM (Standard Method of Measurement), NRM (New Rules of Measurement), CESMM (Civil Engineering Standard Method of Measurement).

2. Measurements & Estimation Tools

  • Quantity Take-off Sheets – For recording measurements of materials and labor requirements.
  • Software Tools – AutoCAD, Revit, CostX, PlanSwift, Bluebeam, or MS Excel for calculations.
  • Measurement Units & Conversion Factors – Understanding metric or imperial unit conversions.

3. Cost & Pricing Data

  • Material Price List – Updated cost of construction materials (cement, steel, bricks, etc.).
  • Labor Rates – Hourly/daily wages for different trades (masons, carpenters, electricians).
  • Equipment & Machinery Costs – Rental or purchase costs of cranes, excavators, concrete mixers.
  • Subcontractor Quotes – Pricing from external contractors for specialized work.
  • Market Rate Analysis – Regional variations in construction costs.

4. Work Breakdown Structure (WBS)

  • Dividing Work into Sections – Foundation, superstructure, finishes, etc.
  • Identifying Work Packages – Earthworks, concrete works, masonry, steelworks, roofing, etc.
  • Sequencing of Work – Logical order of execution for estimation accuracy.

5. Legal & Contractual Documents

  • Tender Documents – BOQ may be part of a tender submission.
  • Contract Agreement – Understanding payment terms, penalties, and project scope.
  • Specifications & Standards – Compliance with local building codes and international standards.

6. Contingencies & Risk Factors

  • Project Risk Assessment – Identifying cost variations, inflation, or unforeseen site conditions.
  • Wastage Factors – Extra materials needed due to cutting, breakage, or handling losses.
  • Profit Margin & Overheads – Adding contractor’s profit, administrative costs, and miscellaneous expenses.

By gathering these elements before starting a BOQ, a QS ensures accurate, efficient, and professional cost estimation for the project.

Here’s a step-by-step breakdown of the construction process for a building (house, shop, or any structure):

Pre-Construction Phase

  1. Land Acquisition – Purchase or lease land suitable for construction.
  2. Site Survey & Analysis – Conduct a land survey, soil test, and environmental impact assessment.
  3. Architectural Design – Create conceptual and detailed architectural plans.
  4. Structural & Engineering Design – Develop structural, electrical, plumbing, and mechanical plans.
  5. Cost Estimation & Budgeting – Quantity surveyor prepares a detailed Bill of Quantities (BOQ).
  6. Approval & Permits – Obtain building permits, local authority approvals, and environmental clearances.
  7. Project Planning & Scheduling – Define timelines, resources, and phases of construction.
  8. Tendering & Contractor Selection – Request bids and select contractors, suppliers, and subcontractors.

Construction Phase

  1. Site Preparation & Clearing – Level the land, remove obstructions, and set up access roads.
  2. Foundation Work – Excavate, lay reinforcements, and pour concrete for foundation.
  3. Structural Work – Build walls, columns, beams, slabs, and roofing.
  4. Utility Installation – Install plumbing, electrical wiring, HVAC, and drainage systems.
  5. Masonry & Plastering – Construct brickwork, apply plaster, and smooth surfaces.
  6. Flooring & Tiling – Lay tiles, wooden, or concrete floors as per design.
  7. Carpentry & Fixtures – Install doors, windows, cabinets, and built-in furniture.
  8. Painting & Finishing – Apply paint, coatings, and decorative elements.
  9. Final Utility & System Checks – Test electrical, plumbing, and mechanical systems.
  10. Final Inspection & Compliance – Government/authority inspections for occupancy approval.

Post-Construction Phase

  1. Handover & Documentation – Transfer property to owner with user manuals, warranties, and compliance certificates.
  2. Occupancy & Use – Move in and start using the building.
  3. Maintenance & Repairs – Regular maintenance and defect liability period management.

Since you're developing a system for quantity surveyors, your system could include:

  • Automated BOQ generation
  • Cost estimation & budgeting
  • Material tracking & procurement
  • Project scheduling & progress tracking
  • Financial management & reporting
  • Compliance & documentation management

Would you like to focus on specific features or integrate AI for cost prediction and planning?




Converting Architectural, Structural, MEP Drawings, Site Survey Reports, and BOQ Formats into a Bill of Quantities (BOQ)

A Bill of Quantities (BOQ) is created by systematically extracting data from project documents and translating them into itemized quantities with pricing. Below is a step-by-step process to convert each input into a BOQ.


1. Understanding Project Documents & Extracting Quantities

Each document provides specific data that contributes to different sections of the BOQ.

a) Architectural Drawings → Civil & Finishing Works in BOQ

🔹 What to extract?

  • Dimensions for walls, doors, windows, ceilings, and floor finishes.
  • Area of plastering, tiling, and painting.
  • Number of doors/windows with sizes.

🔹 BOQ Sections

  • Site preparation & excavation (if required)
  • Masonry works (brick/block walls)
  • Floor, wall, and ceiling finishes (tiling, plastering, painting)
  • Joinery & woodwork (doors, windows, cabinetry)

b) Structural Drawings → Concrete, Steel, and Foundation in BOQ

🔹 What to extract?

  • Volume of concrete for foundations, beams, slabs, and columns.
  • Quantity of reinforcement (kg or tonnage).
  • Formwork area (m²) for casting concrete.

🔹 BOQ Sections

  • Earthwork (excavation, filling, compaction)
  • Reinforced concrete works (footings, slabs, beams, columns)
  • Steelworks (reinforcement bars, structural steel, welding)

c) MEP Drawings → Electrical, Plumbing, HVAC in BOQ

🔹 What to extract?

  • Length of conduits, pipes, and ducts.
  • Number of electrical fixtures (lights, switches, sockets).
  • Number of plumbing fixtures (taps, sinks, WCs).
  • Equipment specifications (air conditioners, pumps, panels).

🔹 BOQ Sections

  • Electrical works (wiring, conduits, switches, panels)
  • Plumbing works (water supply, drainage, sanitary fittings)
  • HVAC works (ducting, air conditioning, ventilation)

d) Site Survey & Soil Investigation Report → Foundation & Earthwork in BOQ

🔹 What to extract?

  • Type of soil and excavation depth required.
  • Need for soil improvement or special foundation work.

🔹 BOQ Sections

  • Site clearing & preparation
  • Excavation & backfilling
  • Soil stabilization (if required)

e) BOQ Format & Standard Codes → Structuring BOQ Correctly

  • Use standard BOQ templates (FIDIC, NRM, CESMM, SMM7, etc.).
  • Follow measurement units (m³ for concrete, m² for tiling, kg for steel).
  • Ensure standard descriptions (e.g., "25 MPa reinforced concrete for footings").

2. Measuring Quantities (Quantity Take-off - QTO)

  • Use AutoCAD, Revit, or PlanSwift to extract exact quantities.
  • Manually measure from scaled drawings using rulers & formulas.
  • Use Excel sheets for calculations & structuring.

3. Preparing BOQ (Example Format)

Item No. Description Unit Quantity Unit Rate Total Cost
1.0 Earthwork
1.1 Site clearance & grubbing 500 X X * 500
1.2 Excavation for foundations 120 X X * 120
2.0 Concrete Works
2.1 Reinforced concrete for footings 50 X X * 50
2.2 Formwork for beams & slabs 200 X X * 200
3.0 Masonry Works
3.1 230mm Brickwork walls 100 X X * 100

4. Applying Costing & Finalizing BOQ

  • Get material rates from suppliers.
  • Use labor rates for different tasks.
  • Add overheads & profit margin (typically 5–15%).
  • Review & validate before finalizing.

Conclusion

To convert project documents into a BOQ, a Quantity Surveyor (QS) needs to:
✅ Extract relevant measurements from drawings & reports.
✅ Use standard BOQ formats for structuring.
✅ Perform accurate quantity take-offs using tools.
✅ Apply market rates for costing.
✅ Review & validate before finalizing.

This structured approach ensures accuracy and efficiency in BOQ preparation. 🚀


For both quantity surveying and construction project management, the system will need various inputs to generate accurate outputs. Here’s a breakdown of all the standard inputs required for cost estimation, budgeting, and project planning:


1. Project Information Inputs

  • Project Name & Description – Title and brief details of the construction project
  • Project Type – Residential, commercial, industrial, road, etc.
  • Site Location – Address, GPS coordinates, and land conditions
  • Building Regulations & Standards – Local codes, safety laws, zoning laws
  • Project Timeline – Start and end date, project phases

2. Land & Site Data Inputs

  • Land Survey Data – Topography, soil type, water table depth
  • Site Accessibility – Roads, transport availability, material supply points
  • Environmental Impact – Weather, flood risks, sustainability concerns
  • Excavation & Foundation Details – Depth of excavation, type of foundation

3. Design & Engineering Inputs

  • Architectural Drawings – 2D plans, 3D models (AutoCAD, Revit, etc.)
  • Structural Drawings – Column, beam, slab, reinforcement details
  • MEP (Mechanical, Electrical, Plumbing) Drawings – HVAC, electrical, water supply, drainage plans
  • Material Specifications – Type of concrete, steel, bricks, wood, finishes

4. Quantity Surveying Inputs (Bill of Quantities - BOQ)

  • List of Materials & Quantities – Cement, bricks, sand, steel, etc.
  • Unit of Measurement – Cubic meters (m³), square meters (m²), kg, tons, etc.
  • Rate of Materials & Labor Costs – Local market rates for materials and labor
  • Wastage Factor – Percentage of material wastage during construction
  • Subcontractor Costs – Fees for different work categories

5. Cost Estimation & Budgeting Inputs

  • Material Prices – Cost per unit of each material
  • Labor Costs – Hourly, daily, or per-task wages
  • Equipment & Machinery Costs – Rental, fuel, maintenance expenses
  • Overhead Costs – Office expenses, transportation, site management costs
  • Contingency Budget – Extra funds for unexpected expenses (5-15%)

6. Procurement & Supplier Inputs

  • Supplier Details – Name, location, contact info
  • Material Delivery Schedule – Estimated time of arrival for materials
  • Payment Terms – Credit period, upfront payments, installment plans

7. Construction Schedule Inputs

  • Project Work Breakdown Structure (WBS) – Division of work into tasks and phases
  • Task Dependencies – Order of activities (foundation before walls, walls before roofing)
  • Resource Allocation – Workers, machines, materials for each task
  • Gantt Chart or Critical Path Method (CPM) Data – Project scheduling techniques

8. Quality Control & Inspection Inputs

  • Testing Reports – Concrete strength tests, soil tests, water quality reports
  • Inspection Logs – Government and third-party inspection records
  • Defect Liability Period (DLP) – Time for addressing post-construction defects

9. Financial & Legal Inputs

  • Construction Contracts – Terms, clauses, penalties, liabilities
  • Loan & Funding Sources – Bank loans, investor contributions, client payments
  • Tax & Compliance Costs – VAT, service taxes, environmental fees
  • Insurance Details – Site insurance, worker insurance, third-party liabilities

10. AI & Data-Driven Inputs (If Using AI)

  • Historical Construction Data – Past project costs, timelines, materials used
  • Market Trends & Inflation Data – Fluctuations in material and labor costs
  • Machine Learning Model Inputs – Data for predictive analysis of costs and delays

Output Generation from These Inputs

  1. Bill of Quantities (BOQ) – Detailed material & labor cost breakdown
  2. Cost Estimates & Budget Report – Total project cost and cash flow management
  3. Material Procurement Plan – When and where to buy materials
  4. Project Schedule (Gantt Chart) – Timeline of construction activities
  5. Resource Allocation Report – Assigned workers, machines, and tools per task
  6. Risk Assessment & Contingency Plan – Plan for unexpected events
  7. Profitability Analysis – Expected profit vs. cost breakdown
  8. AI-Driven Cost Predictions – Future price forecasts based on market data

Would you like to automate specific areas like BOQ generation, cost estimation, or AI-based cost prediction in your system?



Phase 1: Understanding the Domain & Requirements

1. Research & Feasibility Study

  • Understand the roles and responsibilities of a Quantity Surveyor (Cost estimation, material quantity takeoff, contract management, etc.).
  • Identify existing industry standards and software (e.g., CostX, Bluebeam, PlanSwift, Revit).
  • Gather historical data used by QS professionals.

2. Define Project Scope

  • What features will your AI tool have? Example:
    • Material quantity estimation from plans.
    • Cost estimation based on materials and labor.
    • Project budgeting.
    • Risk analysis.
    • BOQ (Bill of Quantities) generation.
  • Will the tool be fully automated or assist a QS?
  • Identify the users (Contractors, Builders, Surveyors, Engineers).

Phase 2: Data Collection & Preprocessing

3. Gather & Clean Data

  • Collect construction datasets (Material costs, labor rates, historical project data).
  • Extract BOM (Bill of Materials), BOQ, and past project cost reports.
  • Label data for training the AI model.

4. Data Sources

  • Open-source construction datasets.
  • Industry reports, government pricing lists.
  • Web scraping from construction price databases.
  • CAD/BIM (Building Information Modeling) integration.

5. Data Preprocessing

  • Convert PDF, images, and blueprints into structured data (OCR for reading PDFs, CAD file parsing).
  • Handle missing values and outliers in cost estimates.

Phase 3: AI Model Development

6. Choose AI/ML Models

  • Material Quantity Takeoff:
    • Computer Vision (YOLO, OpenCV, Faster R-CNN) to detect materials in blueprints.
    • OCR/NLP (Tesseract, OpenAI Whisper, spaCy) for extracting material names.
  • Cost Estimation & Budgeting:
    • Regression Models (Linear Regression, XGBoost, Random Forests) for cost prediction.
    • Neural Networks (LSTMs, Transformers) for complex cost trends.
  • BOQ & Report Generation:
    • NLP (GPT, BERT, LLaMA) for auto-generating project reports.
    • RAG (Retrieval-Augmented Generation) to fetch past project cost data.

7. Model Training & Evaluation

  • Train models on historical construction data.
  • Evaluate with Mean Absolute Error (MAE) or Root Mean Squared Error (RMSE).

Phase 4: Software & System Development

8. Develop a Web/Mobile App

  • Frontend: React.js / Vue.js (for user interface).
  • Backend: Python (Flask/Django) or Node.js.
  • Database: PostgreSQL / MongoDB (to store project data).
  • AI Integration: FastAPI for AI model inference.

9. API & Third-Party Integration

  • BIM (Building Information Modeling) APIs (Autodesk, Revit API).
  • OCR & NLP tools (Google Vision, Tesseract).
  • Cloud storage (AWS S3, Google Drive).

Phase 5: Deployment & Testing

10. Deploy AI Models

  • On-premise or Cloud (AWS, Azure, Google Cloud).
  • Use Docker/Kubernetes for scalability.
  • Model optimization with ONNX, TensorFlow Lite for fast inference.

11. User Testing & Feedback

  • Test with real QS professionals & contractors.
  • Improve AI accuracy based on feedback.

12. Final Deployment & Maintenance

  • Launch a beta version.
  • Plan for regular updates and AI model retraining.

Optional Features (Future Enhancements)

✅ AI-powered voice assistant for contractors.
Augmented Reality (AR) for material estimation in real-time.
Blockchain-based contracts & cost tracking.


Modules for AI/ML-Based Quantity Surveyor Tool (Easy to Hard)

To develop the AI/ML tool efficiently, we will start with simpler modules and then move to complex ones. Below is a breakdown of modules from easy to hard, along with steps to develop them.


🔹 Easy Modules

1. User Management & Authentication

📌 Features:

  • User registration (Contractors, Engineers, QS professionals)
  • Login/logout with role-based access
  • Basic profile management

🛠 How to Develop:

  • Backend: PHP (Laravel), Python (Django/Flask)
  • Database: MySQL/PostgreSQL
  • Authentication: JWT (JSON Web Tokens) or OAuth
  • Frontend: React.js, Vue.js, or simple HTML/CSS

2. Material & Labor Cost Database

📌 Features:

  • Store historical construction material prices (cement, steel, wood, etc.)
  • Store labor costs based on location and expertise

🛠 How to Develop:

  • Database: MySQL/PostgreSQL
  • Data Source: Manually input, Web Scraping, API integration
  • Backend: Python (Django, FastAPI), PHP (Laravel)
  • Admin panel: Allow price updates

3. Basic Cost Estimation Calculator

📌 Features:

  • User inputs material quantities and labor hours
  • System calculates total cost using predefined rates

🛠 How to Develop:

  • Create a formula-based cost calculator
  • Store material rates in database
  • Use a basic form UI to get inputs

🚀 Tech: Python (Flask/FastAPI) for backend, React.js for UI


🔹 Medium Complexity Modules

4. Bill of Quantities (BOQ) Generation

📌 Features:

  • Auto-generate BOQ reports based on user input (items, quantities, rates)
  • Export BOQ as PDF or Excel

🛠 How to Develop:

  • Backend: Python + Pandas for calculations
  • Frontend: Form to input project details
  • Report Generation: Python (ReportLab, Pandas for Excel)

5. Automated Cost Estimation using AI

📌 Features:

  • Predict material and labor costs based on historical data
  • Suggest alternative materials based on budget

🛠 How to Develop:

  • Train an XGBoost/Random Forest model on historical project cost data
  • Use scikit-learn for regression models
  • Store training data in PostgreSQL or MongoDB

6. Blueprint OCR & Text Extraction

📌 Features:

  • Extract text and numbers from scanned blueprints
  • Identify material names, dimensions, project details

🛠 How to Develop:

  • Use Tesseract OCR or Google Vision API
  • Convert extracted data into structured format
  • Train NLP model (spaCy, BERT) to recognize construction terms

🔹 Hard & Advanced Modules

7. AI-Powered Quantity Takeoff from Drawings

📌 Features:

  • Analyze architectural drawings & floor plans
  • Identify walls, doors, windows, floor area
  • Estimate material requirements automatically

🛠 How to Develop:

  • Use Computer Vision (YOLO, OpenCV, TensorFlow)
  • Convert AutoCAD/BIM files into readable formats
  • Implement Deep Learning (Faster R-CNN, Mask R-CNN)

8. 3D Visualization & Augmented Reality

📌 Features:

  • Display project cost estimation overlaid on 3D models
  • Use Augmented Reality (AR) to scan real-world buildings and predict costs

🛠 How to Develop:

  • Use Unity + ARKit/ARCore for visualization
  • Fetch cost data from backend API

🔹 Final Deployment & Testing

📌 After all modules are built, test for accuracy & deploy on AWS/GCP/Azure.


🌟 Recommended Development Path

✅ Start with User Management & Cost Database
✅ Move to BOQ and AI Cost Estimation
✅ Progress to Blueprint Processing & Quantity Takeoff
✅ Finish with 3D & AR Visualizations

This project requires multiple pages, including user authentication, cost database management, AI-powered estimation, blueprint OCR, and a frontend UI. I'll provide a structured codebase using Python (Flask for backend), MySQL (for database), and React.js (for frontend).


🚀 Project Structure

/ai_qs_tool
│── backend/
│   ├── app.py  # Main Flask backend
│   ├── database.py  # MySQL database connection
│   ├── models.py  # SQLAlchemy models
│   ├── routes.py  # API endpoints
│   ├── ai_cost_estimator.py  # AI model for cost estimation
│   ├── blueprint_ocr.py  # OCR module
│   ├── requirements.txt  # Dependencies
│
│── frontend/
│   ├── src/
│   │   ├── components/
│   │   ├── pages/
│   │   ├── App.js  # Main React app
│   │   ├── index.js  # Entry point
│   │   ├── api.js  # API calls to Flask backend
│   │
│   ├── package.json  # React dependencies
│
│── README.md

🔥 Step 1: Backend (Flask API)

First, create a Flask API with user authentication, material database, AI cost estimator, and blueprint OCR.

📌 Install Dependencies

pip install flask flask_sqlalchemy flask_cors flask_jwt_extended opencv-python pytesseract scikit-learn numpy pandas

📌 1. app.py (Main Backend)

from flask import Flask
from flask_cors import CORS
from database import db, migrate
from routes import blueprint

app = Flask(__name__)
app.config['SQLALCHEMY_DATABASE_URI'] = 'mysql://root:password@localhost/ai_qs'
app.config['SQLALCHEMY_TRACK_MODIFICATIONS'] = False
app.config['JWT_SECRET_KEY'] = 'your_secret_key'

db.init_app(app)
migrate.init_app(app, db)
CORS(app)

app.register_blueprint(blueprint)

if __name__ == '__main__':
    app.run(debug=True)

📌 2. database.py (MySQL Connection)

from flask_sqlalchemy import SQLAlchemy
from flask_migrate import Migrate

db = SQLAlchemy()
migrate = Migrate()

📌 3. models.py (Database Tables)

from database import db

class User(db.Model):
    id = db.Column(db.Integer, primary_key=True)
    username = db.Column(db.String(50), unique=True, nullable=False)
    password = db.Column(db.String(100), nullable=False)

class Material(db.Model):
    id = db.Column(db.Integer, primary_key=True)
    name = db.Column(db.String(100), nullable=False)
    unit_price = db.Column(db.Float, nullable=False)

class Project(db.Model):
    id = db.Column(db.Integer, primary_key=True)
    name = db.Column(db.String(100), nullable=False)
    total_cost = db.Column(db.Float)

📌 4. routes.py (API Endpoints)

from flask import Blueprint, request, jsonify
from models import db, User, Material, Project
from flask_jwt_extended import create_access_token
from ai_cost_estimator import predict_cost
from blueprint_ocr import extract_text

blueprint = Blueprint('api', __name__)

@blueprint.route('/register', methods=['POST'])
def register():
    data = request.json
    new_user = User(username=data['username'], password=data['password'])
    db.session.add(new_user)
    db.session.commit()
    return jsonify({'message': 'User registered successfully'})

@blueprint.route('/login', methods=['POST'])
def login():
    data = request.json
    user = User.query.filter_by(username=data['username']).first()
    if user and user.password == data['password']:
        token = create_access_token(identity=user.id)
        return jsonify({'token': token})
    return jsonify({'error': 'Invalid credentials'}), 401

@blueprint.route('/materials', methods=['GET'])
def get_materials():
    materials = Material.query.all()
    return jsonify([{'id': m.id, 'name': m.name, 'price': m.unit_price} for m in materials])

@blueprint.route('/estimate-cost', methods=['POST'])
def estimate_cost():
    data = request.json
    predicted_cost = predict_cost(data['materials'])
    return jsonify({'estimated_cost': predicted_cost})

@blueprint.route('/ocr-blueprint', methods=['POST'])
def process_blueprint():
    file = request.files['file']
    text_data = extract_text(file)
    return jsonify({'extracted_text': text_data})

📌 5. ai_cost_estimator.py (AI Model for Cost Prediction)

import numpy as np
from sklearn.linear_model import LinearRegression

def predict_cost(materials):
    X_train = np.array([[10], [20], [30]])  # Sample Training Data
    y_train = np.array([1000, 2000, 3000])  # Sample Cost Data
    model = LinearRegression()
    model.fit(X_train, y_train)
    total_cost = sum([model.predict([[m['quantity']]])[0] for m in materials])
    return round(total_cost, 2)

📌 6. blueprint_ocr.py (OCR for Blueprint Extraction)

import pytesseract
import cv2
import numpy as np

def extract_text(file):
    npimg = np.frombuffer(file.read(), np.uint8)
    img = cv2.imdecode(npimg, cv2.IMREAD_COLOR)
    text = pytesseract.image_to_string(img)
    return text

🔥 Step 2: Frontend (React.js)

📌 1. Install React

npx create-react-app frontend
cd frontend
npm install axios react-router-dom

📌 2. src/api.js (API Calls)

import axios from 'axios';

const API_URL = 'http://127.0.0.1:5000';

export const login = async (username, password) => {
    const res = await axios.post(`${API_URL}/login`, { username, password });
    return res.data.token;
};

export const getMaterials = async () => {
    const res = await axios.get(`${API_URL}/materials`);
    return res.data;
};

export const estimateCost = async (materials) => {
    const res = await axios.post(`${API_URL}/estimate-cost`, { materials });
    return res.data.estimated_cost;
};

📌 3. src/App.js (Main UI)

import React, { useState } from "react";
import { login, getMaterials, estimateCost } from "./api";

function App() {
    const [token, setToken] = useState(null);
    const [materials, setMaterials] = useState([]);
    const [cost, setCost] = useState(null);

    const handleLogin = async () => {
        const userToken = await login("admin", "password");
        setToken(userToken);
    };

    const fetchMaterials = async () => {
        const data = await getMaterials();
        setMaterials(data);
    };

    const calculateCost = async () => {
        const estimated = await estimateCost([{ name: "Cement", quantity: 10 }]);
        setCost(estimated);
    };

    return (
        <div>
            <button onClick={handleLogin}>Login</button>
            <button onClick={fetchMaterials}>Get Materials</button>
            <button onClick={calculateCost}>Estimate Cost</button>
            {materials.length > 0 && <ul>{materials.map((m) => <li key={m.id}>{m.name} - ${m.price}</li>)}</ul>}
            {cost && <p>Estimated Cost: ${cost}</p>}
        </div>
    );
}

export default App;

✅ Next Steps

  1. Connect UI with all API endpoints.
  2. Deploy Flask on AWS/GCP & React on Vercel.
  3. Add AI-powered blueprint analysis.

Would you like Docker setup or deployment help next? 🚀





💥 Whatsapp https://wa.link/b72px4

💥 YouTube https://www.youtube.com/channel/UCJojbxGV0sfU1QPWhRxx4-A

💥 Blog https://localedxcelcambridgeictcomputerclass.blogspot.com/

💥 WordPress https://computerclassinsrilanka.wordpress.com

💥 Facebook https://web.facebook.com/itclasssrilanka

💥 Wix https://itclasssl.wixsite.com/icttraining

💥 Web https://itclasssl.github.io/eTeacher/

💥 Medium https://medium.com/@itclasssl

💥 Quora https://www.quora.com/profile/BIT-UCSC-UoM-Final-Year-Student-Project-Guide

💥 mystrikingly https://bit-ucsc-uom-final-year-project-ideas-help-guide-php-class.mystrikingly.com/

💥 https://elakiri.com/threads/bit-ucsc-uom-php-mysql-project-guidance-and-individual-classes-in-colombo.1627048/

💥 https://bitbscucscuomfinalprojectclasslk.weebly.com/

💥 https://www.tiktok.com/@onlinelearningitclassso1

💥 https://payhip.com/eTeacherAmithafz/

💥 https://discord.gg/cPWAANKt

💥 https://6789f6ca695da.site123.me/blog

💥 https://eteacher-49046330.hubspotpagebuilder.com/join-the-best-ict-software-project-classes-in-sri-lanka

💥 https://www.tumblr.com/blog/computercoursesincolombo-blog


--


🚀 Join the Best BIT Software Project Classes in Sri Lanka! 🎓  


Are you a BIT student struggling with your final year project or looking for expert guidance to ace your UCSC final year project? 💡 We've got you covered!  


✅ What We Offer:  

- Personalized project consultations  

- Step-by-step project development guidance  

- Expert coding and programming assistance (PHP, Python, Java, etc.)  

- Viva preparation and documentation support  

- Help with selecting winning project ideas  


📅 Class Schedules:  

- Weekend Batches: Flexible timings for working students  

- Online & In-Person Options  


🏆 Why Choose Us?  

- Proven track record of guiding top BIT projects  

- Hands-on experience with industry experts  

- Affordable rates tailored for students  


🔗 Enroll Now: Secure your spot today and take the first step toward project success!  


📞 Contact us: https://web.facebook.com/itclasssrilanka  

📍 Location: Online  

🌐 Visit us online: https://localedxcelcambridgeictcomputerclass.blogspot.com/


✨ Don't wait until the last minute! Start your BIT final year project with confidence and guidance from the best in the industry. Let's make your project a success story!  


Since you want to build the AI-powered Quantity Surveyor (QS) tool using PHP (for backend), Bootstrap (for frontend), MySQL (for database), and Python (for AI processing), I’ll structure the project as follows:


🚀 Project Structure

/ai_qs_tool
│── backend/
│   ├── db.php               # Database connection
│   ├── auth.php             # User authentication (login/register)
│   ├── materials.php        # CRUD for materials
│   ├── estimate.php         # Cost estimation via Python AI
│   ├── blueprint_ocr.php    # Blueprint OCR processing (calls Python)
│
│── ai_processing/           # AI & ML models
│   ├── cost_estimator.py    # AI model for cost prediction
│   ├── blueprint_ocr.py     # OCR module
│
│── frontend/
│   ├── index.php            # Login page
│   ├── dashboard.php        # Main dashboard
│   ├── materials.php        # Material listing & management
│   ├── estimate.php         # Cost estimation form
│   ├── blueprint.php        # Upload blueprint & extract data
│   ├── assets/
│       ├── css/style.css    # Custom styles
│       ├── js/script.js     # JavaScript functions
│
│── README.md
│── config.php               # Configuration file

🔥 Step 1: Database Setup (MySQL)

📌 Create the MySQL Database

CREATE DATABASE ai_qs;
USE ai_qs;

CREATE TABLE users (
    id INT AUTO_INCREMENT PRIMARY KEY,
    username VARCHAR(50) UNIQUE NOT NULL,
    password VARCHAR(255) NOT NULL
);

CREATE TABLE materials (
    id INT AUTO_INCREMENT PRIMARY KEY,
    name VARCHAR(100) NOT NULL,
    unit_price FLOAT NOT NULL
);

CREATE TABLE projects (
    id INT AUTO_INCREMENT PRIMARY KEY,
    name VARCHAR(100) NOT NULL,
    total_cost FLOAT
);

🔥 Step 2: Backend (PHP with MySQL)

📌 1. config.php (Database Connection)

<?php
$host = "localhost";
$user = "root";
$password = "";
$database = "ai_qs";

$conn = new mysqli($host, $user, $password, $database);
if ($conn->connect_error) {
    die("Connection failed: " . $conn->connect_error);
}
?>

📌 2. auth.php (User Authentication)

<?php
session_start();
include 'config.php';

if ($_SERVER["REQUEST_METHOD"] == "POST") {
    $username = $_POST['username'];
    $password = $_POST['password'];

    $query = $conn->prepare("SELECT * FROM users WHERE username=?");
    $query->bind_param("s", $username);
    $query->execute();
    $result = $query->get_result();
    $user = $result->fetch_assoc();

    if ($user && password_verify($password, $user['password'])) {
        $_SESSION['user_id'] = $user['id'];
        header("Location: dashboard.php");
    } else {
        echo "Invalid credentials!";
    }
}
?>

📌 3. materials.php (Manage Materials)

<?php
include 'config.php';

if ($_SERVER["REQUEST_METHOD"] == "POST") {
    $name = $_POST['name'];
    $price = $_POST['unit_price'];

    $query = $conn->prepare("INSERT INTO materials (name, unit_price) VALUES (?, ?)");
    $query->bind_param("sd", $name, $price);
    $query->execute();
}

$result = $conn->query("SELECT * FROM materials");
?>

<!DOCTYPE html>
<html lang="en">
<head>
    <title>Materials</title>
    <link rel="stylesheet" href="https://cdn.jsdelivr.net/npm/bootstrap@5.3.0/dist/css/bootstrap.min.css">
</head>
<body>
    <div class="container">
        <h2>Materials</h2>
        <form method="POST">
            <input type="text" name="name" placeholder="Material Name" required>
            <input type="number" name="unit_price" placeholder="Unit Price" step="0.01" required>
            <button type="submit">Add Material</button>
        </form>
        <table class="table">
            <thead>
                <tr><th>ID</th><th>Name</th><th>Price</th></tr>
            </thead>
            <tbody>
                <?php while ($row = $result->fetch_assoc()): ?>
                <tr><td><?= $row['id'] ?></td><td><?= $row['name'] ?></td><td><?= $row['unit_price'] ?></td></tr>
                <?php endwhile; ?>
            </tbody>
        </table>
    </div>
</body>
</html>

📌 4. estimate.php (Cost Estimation via AI Model)

<?php
include 'config.php';

if ($_SERVER["REQUEST_METHOD"] == "POST") {
    $materials = json_encode($_POST['materials']);
    $output = shell_exec("python3 ai_processing/cost_estimator.py '$materials'");
    echo json_encode(['estimated_cost' => trim($output)]);
}
?>

🔥 Step 3: AI Processing (Python)

📌 1. cost_estimator.py (AI Model for Cost Prediction)

import sys
import json
import numpy as np
from sklearn.linear_model import LinearRegression

def predict_cost(materials):
    X_train = np.array([[10], [20], [30]])  # Sample Training Data
    y_train = np.array([1000, 2000, 3000])  # Sample Cost Data
    model = LinearRegression()
    model.fit(X_train, y_train)

    total_cost = sum([model.predict([[m['quantity']]])[0] for m in materials])
    return round(total_cost, 2)

if __name__ == "__main__":
    materials = json.loads(sys.argv[1])
    print(predict_cost(materials))

📌 2. blueprint_ocr.py (Blueprint OCR Processing)

import sys
import pytesseract
import cv2
import numpy as np

def extract_text(image_path):
    img = cv2.imread(image_path)
    text = pytesseract.image_to_string(img)
    return text

if __name__ == "__main__":
    image_path = sys.argv[1]
    print(extract_text(image_path))

🔥 Step 4: Frontend (Bootstrap + PHP)

📌 1. index.php (Login Page)

<!DOCTYPE html>
<html lang="en">
<head>
    <title>Login</title>
    <link rel="stylesheet" href="https://cdn.jsdelivr.net/npm/bootstrap@5.3.0/dist/css/bootstrap.min.css">
</head>
<body>
    <div class="container">
        <h2>Login</h2>
        <form action="auth.php" method="POST">
            <input type="text" name="username" placeholder="Username" required>
            <input type="password" name="password" placeholder="Password" required>
            <button type="submit">Login</button>
        </form>
    </div>
</body>
</html>

📌 2. dashboard.php (Main Dashboard)

<?php session_start(); if (!isset($_SESSION['user_id'])) header("Location: index.php"); ?>
<!DOCTYPE html>
<html lang="en">
<head>
    <title>Dashboard</title>
    <link rel="stylesheet" href="https://cdn.jsdelivr.net/npm/bootstrap@5.3.0/dist/css/bootstrap.min.css">
</head>
<body>
    <div class="container">
        <h2>Dashboard</h2>
        <a href="materials.php">Manage Materials</a>
        <a href="estimate.php">Estimate Cost</a>
        <a href="blueprint.php">Process Blueprint</a>
    </div>
</body>
</html>

✅ Next Steps

  1. Connect frontend with backend properly.
  2. Deploy PHP (Apache) & MySQL on a live server.
  3. Improve AI model performance.

Would you like Docker setup or deployment guidance next? 🚀

No comments:

Post a Comment